Reports
All relevant project reports and materials can be found here.
GDD Planning Application
The GDD planning application is available to view on a dedicated planning website. Click here to view the planning application.
GDD Public and Stakeholder Participation Report – June 2018
GDD Community Benefits Scheme – June 2018
GDD Community Needs Analysis Study
Foreshore Licence Application
An application for a Foreshore Licence (reference FS006292) was made by the Project Team to the Department of the Environment, Community & Local Government (DECLG) for permission to undertake investigative surveys in the foreshore. The surveys will obtain information about the type of soil and rock that lie beneath the sea bed and will inform the detailed design and construction method of the marine outfall. A statutory public consultation process was held by the DECLG between 11th December 2014 and 20th January 2015 inclusive.
The application and associated information remain available to view at the DECLG website by clicking here
Phase 4 Consultation Report
Phase 4 Consultation Report on the issues to be considered in the EIS
Alternative Sites Assessment and Route Selection (Phase 4): Preferred Sites and Routes Report
- Alternative Sites Assessment and Route Selection (Phase 4): Preferred Sites and Routes Report. Volume 1- Main Report
- Appendix 1_Addendum to ASA Phase 2 Report
- Appendix 2_ Load Assessment Report
- Appendix 3_ASA Methodology Report
- Appendix 4_Consultation Response
- Appendix 5_Ecology Assessment
- Appendix 6_Cultural Heritage (part 1)
- Appendix 6_Cultural Heritage (part 2)
- Appendix 6_Cultural Heritage (part 3)
- Appendix 6_Cultural Heritage (part 4)
- Appendix 7_Landscape
- Appendix 8_Soils-Geology (part 1)
- Appendix 8_Soils-Geology (part 2)
- Appendix 9_Traffic
- Appendix 10_Engineering Design
- Appendix 11_ Hydrographic Survey
- Appendix 12_Hydrodynamic Modelling
- Appendix 13_Drawings (part 1)
- Appendix 13_Drawings (part 2)
Public Consultation Report on ‘Alternative Sites Assessment and Route Selection (Phase 2): Emerging Preferred Sites and Routes Report’.
- Public Consultation Report on ‘Alternative Sites Assessment and Route Selection (Phase 2): Emerging Preferred Sites and Routes Report’.
- Complete Appendices
- Responses to Consultation Issues on ‘Alternative Sites Assessment and Route Selection (Phase 2): Emerging Preferred Sites and Route Report’
Alternative Sites Assessment and Route Selection (Phase 2): Emerging Preferred Sites and Routes Report
- Alternative Sites Assessment and Route Selection (Phase 2): Emerging Preferred Sites and Routes Report. Volume 1- Main Report
- Appendix 1: ASA Methodology Report
- Appendix 2: Consultation Response
- Appendix 3: List of Sub-Criteria
- Appendix 4: ASA Matrix Assessment
- Appendix 5: Ecology Assessment
- Appendix 6: Cultural Heritage Assessment
– High Resolution Full Report
– Report with no figures
– Appendix 6 Figures - Appendix 7: Landscape Assessment
- Appendix 8: Soils & Geology Assessment
- Appendix 9: Hydrology & Hydrogeology Assessment
– High Resolution Full Report
– Report without figures
– Appendix 9 Figures - Appendix 10: Traffic & Access Assessment
- Appendix 11: Agronomy Assessment
- Appendix 12: Air & Odour Assessment
- Appendix 13: Noise & Vibration Assessment
- Appendix 14: Planning Assessment
- Appendix 15: Engineering & Design Assessment
- Appendix 16: Carbon Footprint Assessment
- Appendix 17: Maps and Figures
- Alternative Sites Assessment and Route Selection Matrix
Public Consultation Report on ‘Alternative Site Assessment Phase One: Preliminary Screening Outcomes Report October 2011′
- Public Consultation Report on ‘Alternative Site Assessment Phase One: Preliminary Screening Outcomes Report October 2011’ (Full Report with appendices, Low Resolution)
- Public Consultation Report on ‘Alternative Site Assessment Phase One: Preliminary Screening Outcomes Report October 2011’ (Report without Appendices)
- Appendix A: Advertisement
- Appendix B: Press Releases
- Appendix C: Brochure
- Appendix D: Posters
- Appendix E: Displays
- Appendix F: Facilitation Sheet
- Appendix G: Response Templates
Alternative Site Assessment Phase One- Preliminary Screening Outcomes Report
- ASA Preliminary Screening Outcomes Report Final (Low Resolution)
- ASA Preliminary Screening Outcomes Report Final (Without Figures)
ASA Preliminary Screening Outcomes Report Figures
- Figure 2.1 Study Area
- Figure 4.1 Load Centres
- Figure 4.2 Ecological Constraints
- Figure 4.3 Cultural Heritage Constraints
- Figure 4.4 Geological Constraints
- Figure 4.5 Water Bodies
- Figure4_6_Highly SensitiveLandscapes
- Figure 4.7 Sensitive Receptors
- Figure 4.8_Preliminary Screening Constraints
- Figure 4.9 Locations of Potential Land Parcels
- Figure 4.10 Marine Outfall (Northern)
- Figure 4.11 Marine Outfall (Southern)
- Figure 4.12 Land Parcels with Topographical Background
- Figure 4.13 Final Proposed Land Parcels
- Figure 4.14 Potential Pipeline Corridors
Constraints Consultation Report
Please find below links to the Constraints Consultation Report.
- Constraints Consultation With Appendices (7.08 MB)
- Constraints Consultation without Appendices (579 KB)
- Appendix A_Advertisement Poster (48 KB)
- Appendix B_Press Releases (64 KB)
- Appendix C_Elected Members (80 KB)
- Appendix D_Poster Mail Out (80 KB)
- Appendix E_Open Day Displays (5.08 MB)
- Appendix F_Facilitation Sheet (32 KB)
- Appendix G_Acknowledgement Letter (52 KB)
- Appendix H_Stakeholder Submissions (5.46 MB)
To see the potential land parcels in more detail please go to our Maps page
Note: All literature can be produced in an accessible electronic format suitable for use with JAWS or similar screen reading software for people who are visually impaired. Reports can be provided in Braille if requested. If you require either please email info@greaterdublindrainage.ie or call 0818 44 55 67